EMAIL: PASSWORD:
Front Office
UPT. PERPUSTAKAAN
Universitas Esa Unggul


Kampus Emas UEU - Jakarta Barat

Phone : 021-5674223, ext 282
Fax :
E-mail : library@esaunggul.ac.id
Website : http://library.esaunggul.ac.id

Support (Customer Service) :
perpus@esaunggul.ac.id








Welcome..guys!

Have a problem with your access?
Please, contact our technical support below:
LIVE SUPPORT


Astrid Chrisafi




! ATTENTION !

To facilitate the activation process, please fill out the member application form correctly and completely
Registration activation of our members will process up to max 24 hours (confirm by email). Please wait patiently

Still Confuse?
Please read our User Guide

 List of Teknik Industri » Undergraduate Theses Collections


Total of Records : 117 collections


Published by UEU at 07/02/2019 11:40:09
STUDI KELAYAKAN INVESTASI PENGGANTIAN CONVEYOR JENIS RUBBER BELT MENJADI CONVEYOR JENIS PLASTIC MODULAR BELT PADA COOLING CONVEYOR MESIN TREAD EXTRUDER DI PT.PQR
DANANG PRI ANTORO - Teknik Industri - [ 12 views]

Published by UEU at 28/11/2018 13:32:56
PEMILIHAN MESIN PENANDA KABEL MENGGUNAKAN METODE ACTIVITY BASED COSTING DI PT. ABC
BUDYARTO - Teknik Industri - [ 24 views]

Published by UEU at 21/11/2018 16:53:57
IMPLEMENTASI METODE SIX SIGMA UNTUK PENURUNAN JUMLAH CACAT PRODUK BODY FILTER P84-3887 DI PT. PANATA JAYA MANDIRI
WHILDHAN FATURROHMAN FIRDAUS - Teknik Industri - [ 22 views]

Published by UEU at 21/11/2018 15:13:49
PENINGKATAN KEANDALAN MESIN-MESIN PRODUKSI PT. SUKSES ABADI FARMINDO DENGAN METODE RELIABILITY CENTERED MAINTENANCE
ERIK APRIANTO SAPEI - Teknik Industri - [ 27 views]

Published by UEU at 01/11/2018 13:20:42
PENGARUH PROGRAM 5R (RINGKAS, RAPI, RESIK, RAWAT, RAJIN) TERHADAP PRODUKTIVITAS KERJA KARYAWAN PADA PRODUKSI PEMINTALAN BENANG DI PT. XYZ
DWI SARTONO - Teknik Industri - [ 52 views]

Published by UEU at 08/10/2018 13:16:41
USULAN PERBAIKAN TATA LETAK LINI INNER ASSEMBLING DENGAN SIMULASI SISTEM UNTUK MENGOPTIMALKAN KESEIMBANGAN LINI PRODUKSI MENGGUNAKAN METODE RANKED POSITION WEIGHT DI PT. PANASONIC MANUFACTURING INDONESIA
DIANDRA APRILIA - Teknik Industri - [ 48 views]

Published by UEU at 24/07/2018 16:54:43
PERANCANGAN MEJA DAN BANGKU KANTIN MENGGUNAKAN PENDEKATAN QUALITY FUNCTION DEVELOPMENT DAN ANTHROPOMETRI (Studi Kasus: Universitas Esa Unggul)
FERI PRIS KANANTO - Teknik Industri - [ 76 views]

Published by UEU at 24/07/2018 16:42:08
IMPLEMENTASI QUALITY FUNCTION DEPLOYMENT (QFD) UNTUK MENGUKUR DAN MENINGKATKAN KEPUASAN PELANGGAN PRODUK KARTON BOX PT. DAYACIPTA KEMASINDO
ROBIATUL ISMANIA - Teknik Industri - [ 95 views]

Published by UEU at 24/07/2018 10:13:19
PENGUKURAN DAN ANALISIS BEBAN KERJA MENTAL DAN KUALITAS HIDUP KARYAWAN PEMASARAN PADA ASURANSI XYZ
KARAMIKO ALEXANDER KRISNA - Teknik Industri - [ 106 views]

Published by UEU at 28/06/2018 15:53:41
IMPLEMENTASI OEE UNTUK PENGUKURAN KINERJA MESIN PRODUKSI KAIN KERAS DAN PENINGKATANNYA MENGGUNAKAN METODE FMEA DI PT MEGAH MEGALON INDUSTRIES
ZULFA ADINDA - Teknik Industri - [ 101 views]

Published by UEU at 07/06/2018 10:59:42
PENERAPAN METODE DMAIC DALAM MENURUNKAN DEFECT CANVAS PADA MESIN TOPING CALLENDER DI PT XYZ
MUCHAMAD RIZAL KRISTANTO - Teknik Industri - [ 99 views]

Published by UEU at 07/06/2018 10:47:11
PENENTUAN PRIORITAS STRATEGI PENINGKATAN PENJUALAN DENGAN MENGGUNAKAN METODE SWOT DAN AHP (STUDI KASUS : DUNKELBLUE APPAREL & CLOTHING)
NUR AZIZAH DWI MUSTIKA RINI - Teknik Industri - [ 83 views]

Published by UEU at 25/04/2018 11:36:09
PENGUKURAN DAN PENINGKATAN PRODUKTIVITAS MENGGUNAKAN METODE OMAX (OBJECTIVE MATRIX) DI UNIT FABRIC PROCESSING PT ARGO PANTES TANGERANG
RIO RIZKI PRATAMA - Teknik Industri - [ 89 views]

Published by UEU at 24/04/2018 14:22:52
USULAN PENINGKATAN KESELAMATAN DAN KESEHATAN KERJA MENGGUNAKAN METODE FAULT TREE ANALYSIS DAN 5W1H PADA PT. HOMEWARE INTERNATIONAL INDONESIA
AZIS SYAHPUTRA WIJAYA - Teknik Industri - [ 102 views]

Published by UEU at 19/04/2018 11:19:44
IMPLEMENTASI TAHAPAN 8D UNTUK MENGURANGI CACAT PRODUK PADA PROSES CURING DI PLANT A, PT ABC
MEGANTARA - Teknik Industri - [ 104 views]

Published by UEU at 18/04/2018 15:22:43
EVALUASI DAN PENENTUAN PRIORITAS PERBAIKAN PELAYANAN PROGRAM STUDI DENGAN MENGGUNAKAN METODE SERVICE QUALITY DAN IMPORTANCE PERFORMANCE ANALYSIS (STUDI KASUS PROGRAM STUDI TEKNIK INDUSTRI UNIVERSITAS ESA UNGGUL)
NURUL CHAIRAH - Teknik Industri - [ 118 views]

Published by UEU at 18/04/2018 14:01:28
USULAN PERBAIKAN PROSES PEMASANGAN LINNER PLY PADA MESIN BUILDING TUBLESS MOTORCYCLE DI PT XYZ
DENI - Teknik Industri - [ 109 views]

Published by UEU at 12/03/2018 12:05:38
USULAN MINIMASI CACAT KOMPONEN INNER LINER KULKAS DENGAN METODE SIX SIGMA DI PT. PANASONIC MANUFACTURING INDONESIA
REZQI APRYANDI BAHAR - Teknik Industri - [ 169 views]

Published by UEU at 09/03/2018 10:43:58
PENENTUAN WAKTU TOTAL PROYEK, WAKTU DAN BIAYA PERCEPATAN PROYEK PEMBANGUNAN OIL STORAGE TANK 2500 L MENGGUNAKAN CRITICAL PATH METHOD (CPM) DAN CRASHING TRADE OFF
ANDI SETYAWAN - Teknik Industri - [ 175 views]

Published by UEU at 07/03/2018 14:20:58
ANALISIS PENERAPAN MATERIAL REQUIREMENT PLANNING DAN PERHITUNGAN CAPACITY REQUIREMENT PLANNING PADA PEMERIKSAAN PHYSICAL MATERIAL SYNTHETIC DAN LEATHER DI PT. PANARUB DWIKARYA
KENNY HALIM - Teknik Industri - [ 167 views]

Rec : 1-20 of 117

 

POLLING

Bagaimana pendapat Anda tentang repository kami ?

Bagus Sekali
Baik
Biasa
Jelek
Mengecewakan




21149814


Visitors Today : 46
Total Visitor : 1704070

Hits Today : 1490
Total Hits : 21149814

Visitors Online: 3


Calculated since
16 May 2012

You are connected from 3.82.52.91
using CCBot/2.0 (https://commoncrawl.org/faq/)


UEU Digital Repository Feeds


Copyright © UEU Library 2012 - 2019 - All rights reserved.
Dublin Core Metadata Initiative and OpenArchives Compatible
Developed by Hassan