 |
UPT. PERPUSTAKAAN
Universitas Esa Unggul
Kampus Emas UEU - Jakarta Barat
|
Phone |
: |
021-5674223, ext 282 |
Fax |
: |
|
E-mail |
: |
[email protected] |
Website |
: |
http://library.esaunggul.ac.id
|
Support (Customer Service) :
|
[email protected] |
|
|
Welcome..guys!
|
Have a problem with your access?
Please, contact our technical support below:
|
LIVE SUPPORT
 Astrid Chrisafi
|
! ATTENTION !
To facilitate the activation process, please fill out the member application form correctly and completely
Registration activation of our members will process up to max 24 hours (confirm by email). Please wait patiently
Still Confuse?
Please read our User Guide
|
|
Search Results for keyword 'Six Big Losses'
Total of Records : 59 collections
Published by UEU at 25/03/2021 16:20:45 • 849 Views ANALISIS PENGUKURAN OVERALL EQUIPMENT EFFECTIVENESS (OEE) GUNA MENINGKATKAN EFISIENSI DENGAN METODE PENDEKATAN KAIZEN 5S (STUDI KASUS: PT. XYZ) Created by YUSUF FIRMANSYAH PRATAMA Property of Teknik Industri Department Context Proximity : »»»30% Published by UEU at 24/03/2021 09:57:15 • 437 Views MODEL PENGUKURAN EFEKTIFITAS PERALATAN PENUNJANG PADA GEDUNG BERTINGKAT MILIK PERGURUAN TINGGI DENGAN METODE OEE (STUDI KASUS: LIFT DI UNIVERSITAS XX) Created by M. Derajat Amperajaya ; Arief Suwandi; Mukhamad Abduh; Eva; Santi Yunita Wahid Property of Teknik Industri Department Context Proximity : »»»30% Published by UEU at 12/10/2023 13:35:31 • 545 Views PENGUKURAN DAN UPAYA PENINGKATAN EFEKTIFITAS MESIN SQUEEGEE DI PT DEF MENGGUNAKAN METODE OVERALL EQUIPMENT EFFECTIVENESS (OEE) DAN FMEA Created by TAUFIK GANDAWIJAYA Property of Teknik Industri Department Context Proximity : »»»30% Published by UEU at 31/03/2021 10:46:15 • 1224 Views PENERAPAN TOTAL PRODUCTIVE MAINTENANCE (TPM) MENGGUNAKAN OVERALL EQUIPMENT EFFECTIVENESS (OEE) PADA MESIN GRINDING DI PT. XYZ (STUDI KASUS PT. XYZ) Created by ANITA MUTIA Property of Teknik Industri Department Context Proximity : »»»30% Published by UEU at 22/03/2022 14:59:32 • 377 Views ANALISIS PENGUKURAN PRODUKTIVITAS DENGAN METODE OVERALL EQUIPMENT EFFECTIVENESS DAN OBJECTIVE MATRIX PADA PRODUKSI BODY MOBIL MAINAN SMC 628 DI PT. SINAR HARAPAN PLASTIK Created by KEVIN RICHARDO Property of Teknik Industri Department Context Proximity : »»»30% Published by UEU at 24/02/2020 11:33:07 • 1467 Views USULAN PERBAIKAN PROSES MANUFAKTUR MESIN BEAD GROMMET DENGAN METODE PENGUKURAN OVERALL EQUIPMENT EFFECTIVENESS DI PT. ABC Created by ARYA WAHYU NUGRAHA Property of Teknik Industri Department Context Proximity : »»»30% Published by UEU at 15/06/2021 11:22:49 • 1493 Views USULAN PERBAIKAN KUALITAS DAN MINIMASI REJECT FOR RECYCLE SANDWICHING DENGAN MENGGUNAKAN METODE SIX SIGMA DAN AUTONOMOUS MAINTENANCE DI PT. MIT PLANT JATAKE Created by MUHAMMAD SIGIT RAHARJO Property of Teknik Industri Department Context Proximity : »»»30% Published by UEU at 06/03/2019 17:02:24 • 587 Views MODEL PEMBENTUKAN KEPUTUSAN PEMBELIAN
BERBASIS MENTAL ACCOUNTING PADA INDUSTRI DOC (Day Old Chicken) DI INDONESIA Created by Ir. Jatmiko, MM., MBA ; Ari Anggarani WPT, SE, MM ; Dr. Sudarwan, CIA., QIA., Akt Property of Manajemen Department Context Proximity : »»»30% Published by UEU at 25/05/2021 14:20:47 • 555 Views PARTNERING TOOLS TO ACHIEVE LEAN CONSTRUCTION GOALS Created by Endah Murtiana Sari ; Agustinus Purna Irawan ; M. Agung Wibowo ; Arief Kusuma Among Praja Property of Planologi Department Context Proximity : »»»30% Published by UEU at 17/10/2023 14:12:41 • 506 Views USULAN PENINGKATAN NILAI EFEKTIFITAS OEE (OVERALL EQUIPMENT EFFECTIVENESS) MESIN INSTO DI PT. XYZ,TBK DENGAN MENGGUNAKAN METODE FMEA (FAILURE MODE AND EFFECT ANALYSIS) Created by Erich Daniel Talakua Property of Teknik Industri Department Context Proximity : »»»30%
Rec : 21-40 of 59
:: Related Context of Keyword about 'Six Big Losses' :
Biskuit RSC, Reject for recycle, Sandwiching, Six Sigma, FMEA, Autonomous Maintenance • Loss time, Total Productive Maintenance, Overall Equipment • OEE (overall equipment effectiveness) • OEE, Six Big Losses, Mesin stranding, Kaizen 5S • OEE, Six big losses, Kaizen 5S • Overall Equipment Effectiveness (OEE), Six Big Losses, Equipment Failures Loss. • Overall Equipment Effectiveness, Six Big Losses, FMEA • Overall Equipment Effectiveness, Six Big Losses, Failure Mode and Effect
Analysis, Mesin Spray Drying. • Overall Equipment Effectivness, Diagram Pareto, Diagram Fishbone, Failure
Mode and Effect Analysis, Risk Priority Number • PRODUKTIVITAS • Produktivitas, OEE, OMAX • Proses Produksi, Six Big Losses, Overall Equipment Effectiveness • Sistem Manajemen Pemeliharaan, Total Productive Maintenance (TPM), Overall Equipment Effectiveness (OEE), Diagram Pareto dan Diagram Fishbone • TPM (total productive maintenance) • Total Productive Maintenance, Overall Equipment Effectiveness, Autonomous Maintenance,
Preventive Maintenance. • enam kerugian besar • japan institute of plant maintenance • overall equipment effectiveness • pengujian ban, overall equipment effectiveness, availability, maintenance • produktivitas • six big losses • • |
|
|
|
|
POLLING

       
Visitors Today : 4
Total Visitor : 1970580
Hits Today : 180114
Total Hits : 186245655
Visitors Online: 1
Calculated since 16 May 2012
You are connected from 172.17.121.29 using Mozilla/5.0 AppleWebKit/537.36 (KHTML, like Gecko; compatible; ClaudeBot/1.0; [email protected])
|