 |
UPT. PERPUSTAKAAN
Universitas Esa Unggul
Kampus Emas UEU - Jakarta Barat
|
Phone |
: |
021-5674223, ext 282 |
Fax |
: |
|
E-mail |
: |
[email protected] |
Website |
: |
http://library.esaunggul.ac.id
|
Support (Customer Service) :
|
[email protected] |
|
|
Welcome..guys!
|
Have a problem with your access?
Please, contact our technical support below:
|
LIVE SUPPORT
 Astrid Chrisafi
|
! ATTENTION !
To facilitate the activation process, please fill out the member application form correctly and completely
Registration activation of our members will process up to max 24 hours (confirm by email). Please wait patiently
Still Confuse?
Please read our User Guide
|
|
Search Results for keyword 'overall equipment effectiveness (OEE)'
Total of Records : 207 collections
Published by UEU at 12/11/2021 11:21:00 • 775 Views ANALISIS KINERJA MESIN SPRAY DRAYER DENGAN MENGGUNAKAN METODE OVERALL EQUIPMENT EFFECTIVENESS (OEE) DAN FAILURE MODE
AND EFFECT ANALYSIS (FMEA) Created by EKSAN JAROT BUDI SANTOSA Property of Teknik Industri Department Context Proximity : »»»»»»»»80% Published by UEU at 08/02/2023 11:59:18 • 350 Views USULAN PERBAIKAN MESIN IP (ION PARTIAL) DENGAN METODE PENGUKURAN OVERALL EQUIPMENT EFFECTIVENESS DI PT. ABC Created by Ayu Rana Sari Telaun Banua Property of Teknik Industri Department Context Proximity : »»»»»»»»80% Published by UEU at 18/03/2021 15:49:37 • 837 Views PENGUKURAN KINERJA LINI FANNET DENGAN MENGGUNAKAN METODE OVERALL EQUIPMENT EFFECTIVENESS DI PT TRIPACIFIC ELECTRINDO Created by Iphov K. Sriwana ; Adi Katon Putro Property of Teknik Industri Department Context Proximity : »»»»»»»»80% Published by UEU at 26/11/2024 11:05:27 • 161 Views PENGUKURAN DAN PENINGKATAN EFEKTIVITAS MESIN MENGGUNAKAN PENDEKATAN NILAI OVERALL EQUIPMENT EFFECTIVENESS (OEE) PADA MESIN SPRAY DRYING (STUDI KASUS PT.XYZ) Created by RIZKY FAISAL AMIR Property of Teknik Industri Department Context Proximity : »»»»»»»»80% Published by UEU at 21/01/2021 13:23:14 • 556 Views ANALISIS DAN PENGUKURAN EFEKTIFITAS MESIN DENGAN METODE OVERALL EQUIPMENT EFECCTIVENESS PADA PRODUK SMAX RING DI PT. XYZ TANGERANG Created by Bobby. Pratama Property of Teknik Industri Department Context Proximity : »»»»»»»»80% Published by UEU at 11/05/2023 11:34:44 • 501 Views ANALISIS PERFORMANSI MESIN DRUM TEST MENGGUNAKAN METODE OEE (OVERALL EQUIPMENT EFFECTIVENES) DAN SIX BIG LOSSES PADA PT PTP Created by BAGUS PERMADI SURYO LANGGENG Property of Teknik Industri Department Context Proximity : »»»»»»»»80% Published by UEU at 17/10/2023 14:56:07 • 582 Views EVALUASI KINERJA MESIN AUTOLOADER PADA LINE 21 DENGAN PERHITUNGAN NILAI OVERALL EQUIPMENT EFFECTIVENESS (OEE) DAN ANALISA SIX BIG LOSSES PADA PT INDOFOOD CBP SUKSES MAKMUR CIBITUNG Created by TIAR PANJI KURNIA BHAKTI Property of Teknik Industri Department Context Proximity : »»»»»»»»80% Published by UEU at 31/03/2021 10:32:37 • 472 Views PENGUKURAN KINERJA MESIN PRODUKSI DENGAN METODE OVERALL EQUIPMENT EFFECTIVENESS PADA PT. CAHAYA BIRU SAKTI ABADI Created by Nofi Erni ; Andri Fajar Maulana Property of Teknik Industri Department Context Proximity : »»»»»»»»80% Published by UEU at 12/10/2023 13:35:31 • 540 Views PENGUKURAN DAN UPAYA PENINGKATAN EFEKTIFITAS MESIN SQUEEGEE DI PT DEF MENGGUNAKAN METODE OVERALL EQUIPMENT EFFECTIVENESS (OEE) DAN FMEA Created by TAUFIK GANDAWIJAYA Property of Teknik Industri Department Context Proximity : »»»»»»»»80% Published by UEU at 06/09/2016 11:16:59 • 500 Views SEMINAR "PERSONAL & INTERPERSONAL EFFECTIVENESS-2" UNIVERSITAS ESA UNGGUL Created by Universitas Esa Unggul Property of Magister Administrasi Publik Department Context Proximity : »»»»»»»70%
Rec : 11-30 of 207
:: Related Context of Keyword about 'overall equipment effectiveness (OEE)' :
Loss time, Total Productive Maintenance, Overall Equipment • OEE, Six Big Losses, Mesin stranding, Kaizen 5S • OEE, Six big losses, Kaizen 5S • OVERALL EQUIPMENT EFFECTIVENESS (OEE • OVERALL EQUIPMENT EFFECTIVENESS (OEE) • Oeverall Equipment Effectiveness (OEE), Failure Mode Effect Analysis (FMEA) • Overall Equipment Effectiveness • Overall Equipment Effectiveness (OEE), Six Big Losses, Equipment Failures Loss. • Overall Equipment Effectiveness, Efektifitas, availability
ratio, setup and asjustment losses • Overall Equipment Effectiveness, Failure Mode Effect Analysis, Idling and minor stopages losses dan reduce speed losses • Overall Equipment Effectiveness, Six Big Losses, FMEA • Overall Equipment Effectiveness, Six Big Losses, Failure Mode and Effect
Analysis, Mesin Spray Drying. • Overall Equipment Effectivness, Speed Reduce Lossess, Brainstorming,
Fishbone Diagram, PDCA , Critical to Quality. • PRODUCTIVITY • Performance Ratio • SIX BIG LOSSES • Sistem Manajemen Pemeliharaan, Total Productive Maintenance (TPM), Overall Equipment Effectiveness (OEE), Diagram Pareto dan Diagram Fishbone • Six Big Losses • Total Productive Maintenance, Overall Equipment Effectiveness, Autonomous Maintenance,
Preventive Maintenance. • availability • diagram pareto • enam kerugian besar • fishbone diagram • japan institute of plant maintenance • mesin injection • metode overall equipment effectiveness • overall equipment effectiveness • performance • quality ratio • • |
|
|
|
|
POLLING

       
Visitors Today : 1
Total Visitor : 1970562
Hits Today : 38584
Total Hits : 184554388
Visitors Online: 1
Calculated since 16 May 2012
You are connected from 172.17.121.29 using Mozilla/5.0 AppleWebKit/537.36 (KHTML, like Gecko; compatible; ClaudeBot/1.0; [email protected])
|