 |
UPT. PERPUSTAKAAN
Universitas Esa Unggul
Kampus Emas UEU - Jakarta Barat
|
Phone |
: |
021-5674223, ext 282 |
Fax |
: |
|
E-mail |
: |
[email protected] |
Website |
: |
http://library.esaunggul.ac.id
|
Support (Customer Service) :
|
[email protected] |
|
|
Welcome..guys!
|
Have a problem with your access?
Please, contact our technical support below:
|
LIVE SUPPORT
 Astrid Chrisafi
|
! ATTENTION !
To facilitate the activation process, please fill out the member application form correctly and completely
Registration activation of our members will process up to max 24 hours (confirm by email). Please wait patiently
Still Confuse?
Please read our User Guide
|
|
Search Results for keyword 'overall equipment effectiveness (OEE)'
Total of Records : 207 collections
Published by UEU at 07/03/2023 13:14:26 • 463 Views Measurement and Effort to Improve OEE Value
of SMC 2000 DST Machinery A PT. XYZ
with PDCA Method Created by M. Derajat Amperajaya ; Ragil Murdopo (201521100); Nofi Erni (1034); Taufiqur Rahman ( 201531010); Septian Rahmat Adnan (0327098901); Ghefra Rizkan Gaffara (0425048704) Property of Teknik Industri Department Context Proximity : »»»»»»»70% Published by UEU at 31/03/2021 10:46:15 • 1217 Views PENERAPAN TOTAL PRODUCTIVE MAINTENANCE (TPM) MENGGUNAKAN OVERALL EQUIPMENT EFFECTIVENESS (OEE) PADA MESIN GRINDING DI PT. XYZ (STUDI KASUS PT. XYZ) Created by ANITA MUTIA Property of Teknik Industri Department Context Proximity : »»»»»»»70% Published by UEU at 06/09/2016 11:16:53 • 515 Views SEMINAR "PERSONAL & INTERPERSONAL EFFECTIVENESS-1" UNIVERSITAS ESA UNGGUL Created by Universitas Esa Unggul Property of Magister Administrasi Publik Department Context Proximity : »»»»»»»70% Published by UEU at 25/03/2021 16:20:45 • 848 Views ANALISIS PENGUKURAN OVERALL EQUIPMENT EFFECTIVENESS (OEE) GUNA MENINGKATKAN EFISIENSI DENGAN METODE PENDEKATAN KAIZEN 5S (STUDI KASUS: PT. XYZ) Created by YUSUF FIRMANSYAH PRATAMA Property of Teknik Industri Department Context Proximity : »»»»»»»70% Published by UEU at 22/11/2015 14:01:33 • 823 Views PENGUKURAN DAN UPAYA PENINGKATAN EFEKTIFITAS MESIN INJECTION DENGAN METODE OVERALL EQUIPMENT EFFECTIVENESS PADA DIVISI INJECTION PT. KARYA ADIKITA GALVANIZE Created by SYARIF HIDAYATULLAH Property of Teknik Industri Department Context Proximity : »»»»»»»70% Published by UEU at 22/04/2021 13:04:17 • 275 Views THE ASSESSMENT OF MANAGEMENT EFFECTIVENESS PROGRAM ON ORGANIZATIONAL PERFORMANCE SATISFACTION Created by Sukmo Hadi Nugroho ; Okol Sri Suharyo ; Adi Bandono Property of Magister Manajemen Department Context Proximity : »»»»»»»70% Published by UEU at 23/07/2021 06:26:15 • 708 Views EFFECT OF CUSTOMER SATISFACTION ON CUSTOMER LOYALTY AND MARKETING ORGANIZATION PERFORMANCE IN B2B MARKET OVER HEAVY EQUIPMENT COMPANY Created by Yora Harzaviona ; Tantri Yanuar Rahmat Syah Property of Magister Manajemen Department Context Proximity : »»»»»»»70% Published by UEU at 05/03/2021 16:40:27 • 536 Views LoA : PENGEMBANGAN SISTEM STOCK OPNAME BERBASIS MOBILE APPLICATION USING SDLC METHOD Created by Masmur MT. Tarigan Property of Teknik Informatika Department Context Proximity : »»»»»»60% Published by UEU at 10/06/2021 23:17:03 • 555 Views PENGUKURAN KINERJA MESIN 3 DAN ANALISIS FMEA PADA PROSES PRODUKSI RESIN DI PT. XYZ Created by Atikah Mariah Ulfa ; Septian Rahmat Adnan Property of Teknik Industri Department Context Proximity : »»»»»»60% Published by UEU at 22/10/2021 13:50:51 • 1336 Views PERHITUNGAN OVERALL EQUIPMENT EFFECTIVENESS (OEE) DAN FMEA DALAM MENINGKATKAN EFEKTIFITAS KINERJA MESIN PEMOTONG KOIL BAJA DI PT. XYZ Created by MUHAMAD FAISAL Property of Teknik Industri Department Context Proximity : »»»»»»60%
Rec : 21-40 of 207
:: Related Context of Keyword about 'overall equipment effectiveness (OEE)' :
Loss time, Total Productive Maintenance, Overall Equipment • OEE, Six Big Losses, Mesin stranding, Kaizen 5S • OEE, Six big losses, Kaizen 5S • OVERALL EQUIPMENT EFFECTIVENESS (OEE • OVERALL EQUIPMENT EFFECTIVENESS (OEE) • Oeverall Equipment Effectiveness (OEE), Failure Mode Effect Analysis (FMEA) • Overall Equipment Effectiveness • Overall Equipment Effectiveness (OEE), Six Big Losses, Equipment Failures Loss. • Overall Equipment Effectiveness, Efektifitas, availability
ratio, setup and asjustment losses • Overall Equipment Effectiveness, Failure Mode Effect Analysis, Idling and minor stopages losses dan reduce speed losses • Overall Equipment Effectiveness, Six Big Losses, FMEA • Overall Equipment Effectiveness, Six Big Losses, Failure Mode and Effect
Analysis, Mesin Spray Drying. • Overall Equipment Effectivness, Speed Reduce Lossess, Brainstorming,
Fishbone Diagram, PDCA , Critical to Quality. • PRODUCTIVITY • Performance Ratio • SIX BIG LOSSES • Sistem Manajemen Pemeliharaan, Total Productive Maintenance (TPM), Overall Equipment Effectiveness (OEE), Diagram Pareto dan Diagram Fishbone • Six Big Losses • Total Productive Maintenance, Overall Equipment Effectiveness, Autonomous Maintenance,
Preventive Maintenance. • availability • diagram pareto • enam kerugian besar • fishbone diagram • japan institute of plant maintenance • mesin injection • metode overall equipment effectiveness • overall equipment effectiveness • performance • quality ratio • • |
|
|
|
|
POLLING

       
Visitors Today : 3
Total Visitor : 1970566
Hits Today : 161308
Total Hits : 184872290
Visitors Online: 1
Calculated since 16 May 2012
You are connected from 172.17.121.29 using Mozilla/5.0 AppleWebKit/537.36 (KHTML, like Gecko; compatible; ClaudeBot/1.0; [email protected])
|