EMAIL: PASSWORD:
Front Office
UPT. PERPUSTAKAAN
Universitas Esa Unggul


Kampus Emas UEU - Jakarta Barat

Phone : 021-5674223, ext 282
Fax :
E-mail : [email protected]
Website : http://library.esaunggul.ac.id

Support (Customer Service) :
[email protected]








Welcome..guys!

Have a problem with your access?
Please, contact our technical support below:
LIVE SUPPORT


Astrid Chrisafi




! ATTENTION !

To facilitate the activation process, please fill out the member application form correctly and completely
Registration activation of our members will process up to max 24 hours (confirm by email). Please wait patiently

Still Confuse?
Please read our User Guide

Keyword
Mode
Expanded Search (for Free text search only)
 

 Search Results for keyword 'overall equipment effectiveness (OEE)'


Total of Records : 208 collections

Published by UEU at 22/10/2021 13:50:51 • 1342 Views
PERHITUNGAN OVERALL EQUIPMENT EFFECTIVENESS (OEE) DAN FMEA DALAM MENINGKATKAN EFEKTIFITAS KINERJA MESIN PEMOTONG KOIL BAJA DI PT. XYZ
Created by MUHAMAD FAISAL
Property of Teknik Industri Department
Context Proximity : »»»»»»60%
    
Published by UEU at 19/02/2024 21:26:22 • 289 Views
THE INFLUENCE OF PARENTING STYLE ON THE EFFECTIVENESS OF THE STUNTING RATE REDUCTION PROGRAM
Created by Ikeu Kania ; Handrini Ardiyanti (8950580023) ; Herlina Tarigan ; Mila Karmila ; Ema Rismayanti ; Ni Wayan Supriliyani ; Melkianus R. Nenometa
Property of Public Relation Department
Context Proximity : »»»»»»60%
    
Published by UEU at 25/03/2021 15:48:24 • 755 Views
IMPLEMENTASI OVERALL EQUIPMENT EFFECTIVENESS (OEE) GUNA MENINGKATKAN PERFORMA MESIN PRODUKSI SWING ARM MOTOR DENGAN PENYELESAIANNYA MENGGUNAKAN METODE KAIZEN 5S DI PT. GEMA AIR MASINDO
Created by ZAKI MAULANA
Property of Teknik Industri Department
Context Proximity : »»»»»»60%
    
Published by UEU at 29/11/2019 11:09:33 • 618 Views
IDENTIFIKASI PENYEBAB RENDAHNYA KINERJA MESIN DAN USULAN PERBAIKAN DENGAN METODE OEE DAN FMEA DI CORRUGATOR SECTION PT. KATI KARTIKA MURNI
Created by Haerullah Ali
Property of Teknik Industri Department
Context Proximity : »»»»»»60%
    
Published by UEU at 02/11/2015 13:32:06 • 960 Views
THE COMPARISON OF EFFECTIVENESS SOCIAL MEDIA ON PURCHASE DECISION Case Study in Garuda Indonesia Airlines
Created by IIN INDRIAWATI
Property of Manajemen Department
Context Proximity : »»»»»»60%
    
Published by UEU at 18/03/2017 12:30:55 • 353 Views
HUBUNGAN PENGETAHUAN TENTANG ALAT PELINDUNG DIRI (APD) DENGAN KEPATUHAN PENGGUNAAN ALAT PELINDUNG DIRI (APD) PADA PEKERJA PROYEK KANTOR PUSAT UNIFAM TAHUN 2016
Created by NISA SOFY MELATI
Property of Kesehatan Masyarakat Department
Context Proximity : »»»»»»60%
    
Published by UEU at 07/07/2021 23:54:42 • 328 Views
TRANSFORMATIONAL LEADERSHIP ROLE IN HUMAN RESOURCE EFFECTIVENESS
Created by Gunawan ; Rhian Indradewa ; Tantri Yanuar R. Syah ; Diana Fajarwati
Property of Magister Manajemen Department
Context Proximity : »»»»»»60%
    
Published by UEU at 07/06/2021 11:04:58 • 1039 Views
SISTEM PENGAWASAN IMPLEMENTASI PELIMPAHAN KEWENANGAN NEGARA KEPADA PIHAK KETIGA DALAM INSPEKSI PERALATAN TEKNIK DARI PERSPEKTIF ADMINISTRASI PUBLIK
Created by Nixon Erzed ; Ayun Maduwinarti
Property of Teknik Informatika Department
Context Proximity : »»»»»»60%
    
Published by UEU at 22/03/2022 14:59:32 • 377 Views
ANALISIS PENGUKURAN PRODUKTIVITAS DENGAN METODE OVERALL EQUIPMENT EFFECTIVENESS DAN OBJECTIVE MATRIX PADA PRODUKSI BODY MOBIL MAINAN SMC 628 DI PT. SINAR HARAPAN PLASTIK
Created by KEVIN RICHARDO
Property of Teknik Industri Department
Context Proximity : »»»»»»60%
    
Published by UEU at 04/01/2021 14:49:09 • 899 Views
IMPLEMENTASI OVERALL EQUIPMENT EFFECTIVENESS (OEE) DAN PENINGKATANNYA DENGAN METODE PDCA PADA MESIN SMC 2000 DTC DI PT XYZ
Created by RAGIL MURDOPO
Property of Teknik Industri Department
Context Proximity : »»»»»»60%
    

Rec : 31-50 of 208

Prev   Next




:: Related Context of Keyword about 'overall equipment effectiveness (OEE)' :

Loss time, Total Productive Maintenance, Overall Equipment • OEE, Six Big Losses, Mesin stranding, Kaizen 5S • OEE, Six big losses, Kaizen 5S • OVERALL EQUIPMENT EFFECTIVENESS (OEE • OVERALL EQUIPMENT EFFECTIVENESS (OEE) • Oeverall Equipment Effectiveness (OEE), Failure Mode Effect Analysis (FMEA) • Overall Equipment Effectiveness • Overall Equipment Effectiveness (OEE), Six Big Losses, Equipment Failures Loss. • Overall Equipment Effectiveness, Efektifitas, availability ratio, setup and asjustment losses • Overall Equipment Effectiveness, Failure Mode Effect Analysis, Idling and minor stopages losses dan reduce speed losses • Overall Equipment Effectiveness, Six Big Losses, FMEA • Overall Equipment Effectiveness, Six Big Losses, Failure Mode and Effect Analysis, Mesin Spray Drying. • Overall Equipment Effectivness, Speed Reduce Lossess, Brainstorming, Fishbone Diagram, PDCA , Critical to Quality. • PRODUCTIVITY • Performance Ratio • SIX BIG LOSSES • Sistem Manajemen Pemeliharaan, Total Productive Maintenance (TPM), Overall Equipment Effectiveness (OEE), Diagram Pareto dan Diagram Fishbone • Six Big Losses • Total Productive Maintenance, Overall Equipment Effectiveness, Autonomous Maintenance, Preventive Maintenance. • availability • diagram pareto • enam kerugian besar • fishbone diagram • japan institute of plant maintenance • mesin injection • metode overall equipment effectiveness • overall equipment effectiveness • overall equipment effectiveness, failure mode and effect analysis, bead grommet • performance • quality ratio •  • 

 

POLLING












188762945


Visitors Today : 3
Total Visitor : 1970600

Hits Today : 580912
Total Hits : 188762945

Visitors Online: 4


Calculated since
16 May 2012

You are connected from 172.17.121.29
using Mozilla/5.0 AppleWebKit/537.36 (KHTML, like Gecko; compatible; ClaudeBot/1.0; [email protected])


UEU Digital Repository Feeds


Copyright © UEU Library 2012 - 2025 - All rights reserved.
Dublin Core Metadata Initiative and OpenArchives Compatible
Developed by Hassan