 |
UPT. PERPUSTAKAAN
Universitas Esa Unggul
Kampus Emas UEU - Jakarta Barat
|
Phone |
: |
021-5674223, ext 282 |
Fax |
: |
|
E-mail |
: |
[email protected] |
Website |
: |
http://library.esaunggul.ac.id
|
Support (Customer Service) :
|
[email protected] |
|
|
Welcome..guys!
|
Have a problem with your access?
Please, contact our technical support below:
|
LIVE SUPPORT
 Astrid Chrisafi
|
! ATTENTION !
To facilitate the activation process, please fill out the member application form correctly and completely
Registration activation of our members will process up to max 24 hours (confirm by email). Please wait patiently
Still Confuse?
Please read our User Guide
|
|
Search Results for keyword 'overall equipment effectiveness (OEE)'
Total of Records : 207 collections
Published by UEU at 28/08/2020 16:29:16 • 966 Views IMPROVED YM LASER MACHINE PERFORMANCE WITH OVERALL EQUIPMENT
EFFECTIVENESS AND FAULT TREE ANALYSIS METHODS IMPLEMENTATION AT PT.
XYZ Created by ARIEF SUWANDI, ST, MT ; Zulhilmi Naufal Aulia Property of Teknik Industri Department Context Proximity : »»»»»»»»»»»110% Published by UEU at 17/02/2022 13:44:21 • 720 Views PENERAPAN OVERALL EQUIPMENT EFFECTIVENESS (OEE) GUNA MENGURANGI SIX BIG LOSSES DI PT.XYZ Created by ERWIN HILMAN NUGRAHA Property of Teknik Industri Department Context Proximity : »»»»»»»»»»»110% Published by UEU at 09/02/2023 10:05:01 • 339 Views PENGUKURAN EFEKTIVITAS MESIN MENGGUNAKAN METODE OVERALL EQUIPMENT EFFECTIVENESS (OEE) DAN SIX BIG LOSSES PADA MESIN DOUBLE CUTTER 05 DI PT. INDAH KIAT PULP & PAPER, TBK. Created by Irvan Aji Pramono Property of Teknik Industri Department Context Proximity : »»»»»»»»»»100% Published by UEU at 18/03/2021 15:36:55 • 378 Views PENGUKURAN OVERALL EQUIPMENT EFFECTIVENESS(OEE) UNTUK PERBAIKAN PROSES MANUFAKTUR MESIN BEAD GROMMET Created by Taufiqur Rachman ; Arya Wahyu Nugraha Property of Teknik Industri Department Context Proximity : »»»»»»»»»90% Published by UEU at 22/01/2020 10:34:23 • 801 Views PENGUKURAN OVERALL EQUIPMENT EFFECTIVENESS DAN PERBAIKAN PERFORMA MESIN YM LASER DENGAN FAULT TREE ANALYSIS DI PT. PRATAMA ABADI INDUSTRI Created by ZULHILMI NAUFAL AULIA Property of Teknik Industri Department Context Proximity : »»»»»»»»»90% Published by UEU at 25/08/2020 12:29:21 • 1023 Views ANALYSIS OF OVERALL EFFECTIVENESS ON HALL SEPARATOR PUNCHING MACHINE AT PT. DNIA Created by Dr. IPHOV KUMALA SRIWANA, ST, M.Si ; NADYA SYAUQILLAH Property of Teknik Industri Department Context Proximity : »»»»»»»»»90% Published by UEU at 13/04/2022 09:59:10 • 441 Views PENERAPAN TOTAL PRODUCTIVE MAINTENANCE (TPM) MENGGUNAKAN OVERALL EQUIPMENT EFFECTIVENESS (OEE) PADA PT. SERMANI STEEL MAKASSAR Created by SRI ARFIANTI Z. Property of Teknik Industri Department Context Proximity : »»»»»»»»»90% Published by UEU at 08/12/2023 15:05:36 • 897 Views PENGUKURAN DAN PENINGKATAN KINERJA MESIN
C2000 MENGGUNAKAN METODE OEE (OVERALL
EQUIPMENT EFFECTIVENESS) DI PT. S Created by Zahra Kartika Novandari Property of Teknik Industri Department Context Proximity : »»»»»»»»80% Published by UEU at 10/09/2020 09:55:13 • 693 Views PENYEMPURNAAN IMPLEMENTASI TOTAL PRODUCTIVE MAINTENANCE (TPM) DENGAN ANALISIS OVERALL EQUIPMENT EFFECTIVENESS PADA MESIN OVERWRAPPING DI PT XYZ Created by SARAH ULI MAGDALENA Property of Teknik Industri Department Context Proximity : »»»»»»»»80% Published by UEU at 18/10/2021 11:16:29 • 385 Views RANCANGAN PERBAIKAN NILAI OVERALL EQUIPMENT EFFECTIVENESS (OEE) DAN SIX BIG LOSSES PADA MESIN BUKA KACA DI PT. XYZ Created by Yanuar Ishaq Property of Teknik Industri Department Context Proximity : »»»»»»»»80%
Rec : 1-20 of 207
:: Related Context of Keyword about 'overall equipment effectiveness (OEE)' :
Loss time, Total Productive Maintenance, Overall Equipment • OEE, Six Big Losses, Mesin stranding, Kaizen 5S • OEE, Six big losses, Kaizen 5S • OVERALL EQUIPMENT EFFECTIVENESS (OEE • OVERALL EQUIPMENT EFFECTIVENESS (OEE) • Oeverall Equipment Effectiveness (OEE), Failure Mode Effect Analysis (FMEA) • Overall Equipment Effectiveness • Overall Equipment Effectiveness (OEE), Six Big Losses, Equipment Failures Loss. • Overall Equipment Effectiveness, Efektifitas, availability
ratio, setup and asjustment losses • Overall Equipment Effectiveness, Failure Mode Effect Analysis, Idling and minor stopages losses dan reduce speed losses • Overall Equipment Effectiveness, Six Big Losses, FMEA • Overall Equipment Effectiveness, Six Big Losses, Failure Mode and Effect
Analysis, Mesin Spray Drying. • Overall Equipment Effectivness, Speed Reduce Lossess, Brainstorming,
Fishbone Diagram, PDCA , Critical to Quality. • PRODUCTIVITY • Performance Ratio • SIX BIG LOSSES • Sistem Manajemen Pemeliharaan, Total Productive Maintenance (TPM), Overall Equipment Effectiveness (OEE), Diagram Pareto dan Diagram Fishbone • Six Big Losses • Total Productive Maintenance, Overall Equipment Effectiveness, Autonomous Maintenance,
Preventive Maintenance. • availability • diagram pareto • enam kerugian besar • fishbone diagram • japan institute of plant maintenance • mesin injection • metode overall equipment effectiveness • overall equipment effectiveness • performance • quality ratio • • |
|
|
|
|
POLLING

       
Visitors Today : 1
Total Visitor : 1970558
Hits Today : 119979
Total Hits : 184274689
Visitors Online: 1
Calculated since 16 May 2012
You are connected from 172.17.121.29 using Mozilla/5.0 AppleWebKit/537.36 (KHTML, like Gecko; compatible; ClaudeBot/1.0; [email protected])
|