EMAIL: PASSWORD:
Front Office
UPT. PERPUSTAKAAN
Universitas Esa Unggul


Kampus Emas UEU - Jakarta Barat

Phone : 021-5674223, ext 282
Fax :
E-mail : [email protected]
Website : http://library.esaunggul.ac.id

Support (Customer Service) :
[email protected]








Welcome..guys!

Have a problem with your access?
Please, contact our technical support below:
LIVE SUPPORT


Astrid Chrisafi




! ATTENTION !

To facilitate the activation process, please fill out the member application form correctly and completely
Registration activation of our members will process up to max 24 hours (confirm by email). Please wait patiently

Still Confuse?
Please read our User Guide

Keyword
Mode
Expanded Search (for Free text search only)
 

UEU » Journal » Teknik Industri
Posted by [email protected] at 17/03/2021 16:00:45  •  850 Views


PERBANDINGAN METODE RANKED POSITIONAL WEIGHT (RPW), METODE LARGEST CANDIDATE RULE, DAN METODE J-WAGON UNTUK PENENTUAN KESEIMBANGAN LINTASAN OPTIMAL PRODUKSI SAMPEL SEPATU MODEL SSOW

Created by :
Taufiqur Rachman ( 0315077803 )
Crystal Aviantari Santoso



SubjectMETODE
PRODUKSI
SEPATU
Alt. Subject METHOD
PRODUCTION
SHOES
Keywordbottleneck
keseimbangan lintasan
metode heuristik

Description:

Penelitian ini bertujuan untuk menentukan keseimbangan lintasan optimal dengan menggunakan metode Helgesson-Birnie/Ranked Positional Weight (RPW), MetodeLargest Candidate Rule, dan Metode J-Wagon, agar menghasilkan hasil yang optimal sehingga dapat mencapai sasaran secara tepat waktu, tepat jumlah, tepat mutu dengan biaya yang lebih effisien. Metode ini menggunakan aturan-aturan yang logis dalam memecahkan masalah. Dengan objek penelitian proses pembuatan salah satu model sepatu yaitu model SSOW di PT.PBI. Keseimbangan lini perlu dilakukan karena adanya bottleneck pada proses menjahit komponen quarter stretch ke upper dan proses pendinginan sepatu menggunakan mesin Chiller. Bottleneck disebabkan karena perbedaan waktu proses yang cukup signifikan, sehingga menyebabkan menganggurnya beberapa proses kerja yang beroperasi setelahnya. Dari hasil penelitian ini dapat diketahui bahwa ketiga metode heuristik yang digunakan menghasilkan keluaran potensial yang sama-sama optimal yaitu efisiensi lini sebesar 85.50%, balanced delay sebesar 14.5%, dan total waktu menganggur sebesar 292.413 detik dengan jumlah stasiun kerja sebesar 7 stasiun kerja. Dengan menggunakan metode heuristik keseimbangan lintasan, terjadi peningkatan efisiensi sebesar 69.33%, dan penurunan balance delay sebesar 69.33%, serta pengurangan total waktu menganggur sebesar 8640 detik.


Alt. Description

This research aims to determine the optimal line balance using the heuristic method, among others Helgesson-Birnie/Ranked Positional Weight (RPW) method, Largest Candidate Rule method, and J-Wagon method, to produce optimal results so that they can reach the target in a timely, exact number, right quality with more efficient costs. This method uses rules that are logical in solving problems. With the object of research on the process of making one of the shoe models, namely the SSOW model at PT.PBI. Line balance needs to be done because of the bottleneck in the sewing process of quarter stretch components to the upper and the shoe cooling process using a Chiller machine. Bottleneck is caused by a significant difference in processing time, which causes idle work processes to operate afterwards. From the research it can be know that the three heuristic methods used resulting potential output are equally optimal, the line efficiency is 85.50%, balanced delay is 14.5%, and total idle time is 292,413 seconds with the number of work stations of 7 work stations. By using the heuristic methods of line balance, there was an increase in efficiency of 69.33%, and a decrease in balance delay of 69.33%, and a reduction in the total idle time of 8640 seconds.

Date Create:17/03/2021
Type:Text
Format:pdf
Language:Indonesian
Identifier:UEU-Journal-11_0980
Collection ID:11_0980


Source :
Jurnal Inovisi Volume 15 Nomor 1, April 2019

Relation Collection:
Fakultas Teknik

Coverage :
Civitas Akademika Universitas Esa Unggul

Rights :
@2021 Perpustakaan Universitas Esa Unggul


Publication URL :
https://digilib.esaunggul.ac.id/perbandingan-metode-ranked-positional-weight-rpw-metode-largest-candidate-rule-dan-metode-jwagon--untuk-penentuan-keseimbangan-lintasan-optimalproduksi-sampel-sepatu-model-ssow-19357.html




[ Free Download - Free for All ]

  1.  UEU-Journal-19357-11_0980.pdf - 810 KB

[ FullText Content - Please, register first ]

...No Files...

 10 Similar Document...

     No similar subject found !

 10 Related Document...






HELP US !
You can help us to define the exact keyword for this document by clicking the link below :

bottleneck , heuristik , keseimbangan , keseimbangan lintasan , lintasan , metode , metode heuristik



POLLING

Bagaimana pendapat Anda tentang repository kami ?

Bagus Sekali
Baik
Biasa
Jelek
Mengecewakan




155050016


Visitors Today : 6
Total Visitor : 1970030

Hits Today : 74067
Total Hits : 155050016

Visitors Online: 1


Calculated since
16 May 2012

You are connected from 172.17.121.29
using Mozilla/5.0 AppleWebKit/537.36 (KHTML, like Gecko; compatible; ClaudeBot/1.0; [email protected])


UEU Digital Repository Feeds


Copyright © UEU Library 2012 - 2024 - All rights reserved.
Dublin Core Metadata Initiative and OpenArchives Compatible
Developed by Hassan