EMAIL: PASSWORD:
Front Office
UPT. PERPUSTAKAAN
Universitas Esa Unggul


Kampus Emas UEU - Jakarta Barat

Phone : 021-5674223, ext 282
Fax :
E-mail : [email protected]
Website : http://library.esaunggul.ac.id

Support (Customer Service) :
[email protected]








Welcome..guys!

Have a problem with your access?
Please, contact our technical support below:
LIVE SUPPORT


Astrid Chrisafi




! ATTENTION !

To facilitate the activation process, please fill out the member application form correctly and completely
Registration activation of our members will process up to max 24 hours (confirm by email). Please wait patiently

Still Confuse?
Please read our User Guide

Keyword
Mode
Expanded Search (for Free text search only)
 

UEU » Scientific Articles » Teknik Industri
Posted by [email protected] at 12/01/2015 17:42:48  •  1556 Views


IMPROVEMENT WORK EFFICIENCY AND MANUFACTURING PRODUCTIVITY AT PT. XYZ WITH LINE BALANCING ANALYSIS

Created by :
Arief Suwandi ( none )



SubjectPRODUKTIVITAS
EFISIENSI
Alt. Subject PRODUCTIVITY
PERFORMANCE
GUARANTEE
Keywordline balancing
cycle time
work station
Ranked Positional Weight (RPW)

Alt. Description

The era of globalization where is competitors continues to grow in competing, industrial enterprises charge for continuously improve performance and productivity with guaranteed quality and low cost and must be able to minimize waste which often occur in the operational area. PT. XYZ is a company that is production shoes massively, production planning should be notice, production scheduling and assignment each of the job. When is setting production process and improver planning in every work station a cross assembly will not efficient because arrive materials unbalanced between work stations. now days company issues is how increase the productivity of the plant, that is shoes soccer Nitro production by improving the working line or line balancing so production capacity can be increased. Line balancing is one of affirmation jobs method into work stations interrelated in a production line so every work stations have a time which does not exceed the cycle time job, Reasearchers analyzed on assembling parts which consists of 34 process and 32 operator. Measurement cycle time every work stations, calculated normal time and frozen time cycle time for assembly maits are basic for doing equilibrium line. With ranked positional weight ( RPW ) / Helgeson � Birnie method work stations can be adaptations so result obtained after merging is 25 work stations incorporations, amount 23 of 32 people before the marger incorporation.

Contributor:
  1. Prianggara NAL
Date Create:12/01/2015
Type:Text
Format:pdf
Language:Indonesian
Identifier:UEU-Article-SCI_7th_ISIEM_SUW
Collection ID:SCI_7th_ISIEM_SUW


Source :
Proceeding 7 th International Seminar on Industrial Engineering and Management, 2014

Relation Collection:
FAKULTAS TEKNIK

Coverage :
Civitas Akademika Universitas Esa Unggul

Rights :
Copyright@2014


Publication URL :
https://digilib.esaunggul.ac.id/improvement-work-efficiency-and-manufacturing-productivity-at-pt-xyz-with-line-balancing-analysis-4823.html




[ Free Download - Free for All ]

...No Files...

[ FullText Content - Please, register first ]

  1. UEU-Article-4823-Paper 90 Arief Suwandi Esa Unggul University.pdf - 558 KB

 10 Similar Document...

     No similar subject found !

 10 Related Document...

     No related subject found !




HELP US !
You can help us to define the exact keyword for this document by clicking the link below :

(RPW) , Positional , Ranked , Ranked Positional Weight (RPW) , Weight , balancing , cycle , cycle time , line , line balancing , station , time , work , work station



POLLING

Bagaimana pendapat Anda tentang repository kami ?

Bagus Sekali
Baik
Biasa
Jelek
Mengecewakan




157318743


Visitors Today : 3
Total Visitor : 1970111

Hits Today : 70284
Total Hits : 157318741

Visitors Online: 1


Calculated since
16 May 2012

You are connected from 172.17.121.29
using Mozilla/5.0 AppleWebKit/537.36 (KHTML, like Gecko; compatible; ClaudeBot/1.0; [email protected])


UEU Digital Repository Feeds


Copyright © UEU Library 2012 - 2024 - All rights reserved.
Dublin Core Metadata Initiative and OpenArchives Compatible
Developed by Hassan